European R&D project
EECONE: greener electronics to reduce electronic waste in Europe
A European project that aims to reduce the volume of electronic waste in the European Union by applying the 6R concept.

What the EECONE project develops
EECONE (European Ecosystem for Green Electronics) proposes effective ways to reduce electronic waste in the European Union and move towards zero waste.
The project is built on the 6Rs: rationalise, reduce, redesign, reuse, repair and recycle. Sustainability needs smart tools to be effective, and the electronics designed today must meet increasingly demanding environmental requirements.
Celestia TST’s role
Celestia TST developed a tool to select batteries for IoT devices using environmental criteria and another to estimate battery lifetime in an IoT infrastructure. It also designed a field monitoring probe for smart farming with a modular printed circuit board, so the main components, such as the communications module, can be reused. The design uses organic substrates and easily recyclable batteries.
EECONE project at a glance
Consortium
48 partners coordinated by Infineon Technologies AG (Germany).
Funding
Horizon Europe, through the Key Digital Technologies Joint Undertaking (KDT JU). Grant agreement No 101112065. Total cost: €34,846,208.68. Celestia TST share: €561,875. See the CORDIS fact sheet
Timeline
Start: July 2023. End: November 2026.
This project has received funding from the Key Digital Technologies Joint Undertaking (KDT JU), now the Chips JU, under grant agreement No 101112065, with support from the European Union’s Horizon Europe research and innovation programme.

Do you have an R&D challenge?
Tell us what you want to validate and we will design a controlled-risk pilot with you.